Category
Projects

Bridge Wing Replacement

CSL Reliance

M2P Engineering removed the existing port side bridge wing and reinstated a new 350Gr fully welded wing, which was fabricated in M2P’s workshop. A 60t slew crane and 27m knuckle boom were required for the project. Access was managed carefully in a constrained space on the vessel’s berthing wharf.